Raffles Hotel

Client:

Dedicated Construction

Address:

Raffles Hotel, Applecross

The Project:

Commercial Kitchen

Description:

We built a high quality commercial kitchen in an extremely tight time frame. We fabricated and installed a range of equipment including benches, pass throughs, spine walls, wall cladding and flashings.

Challenges overcome:

Our client demanded a high quality finish, but with a quick turnaround. A project that was meant to be completed in six months, was required to be completed in just three.

This effectively meant we had to design, measure and make the commercial kitchen whilst the building got rebuilt. The whole internal and external areas of the building were demolished, only leaving the building’s original shell. As the new walls were being built, we were measuring, fabricating and installing cladding in stainless steel and all other elements as we went.

Client Feedback

“I have engaged Metro Steel Services on multiple hospitality fit-out projects and have always been very happy with all aspects of their work.

Due to the added difficulties that come with hospitality projects I have great confidence in Metro’s ability to provide accurate and well manufactured workmanship under tight timelines.”

Josh Tunks – Director